A client was installing a 3000 bbl fire water tank at a new facility and they were looking for a stable base for the tank while also minimizing potential soil side corrosion issues in the future.
Ecoraster E50 was chosen for the project as a significantly more cost effective option over a steel framed base or a more traditional gravel pad. The origional plan was to install the E50 unfilled, but in the end it was decided to fill the grid with gravel.